The water was pumped to a low service reservoir on East Keeling Avenue built in 1901 at a cost of $8,575.00. Water was pumped from Ethel Springs Reservoir by a steam driven pump that was located in the still existing white frame building at the water treatment plant. Pictures from the construction of Lake Ethel (Click pictures to enlarge) Raw water is fed from the McGee Run Reservoirs and from natural springs. The reservoir has an area of 30 acres and a capacity of 160 million gallons. In 1900 the Derry Water Company contracted H. Though the Millwood source is no longer used. Millwood Run Reservoir was constructed in 1890 at a cost of $2,092.04. Upper McGee Run Reservoir was also constructed in 1888 at a cost of $12,704.00. The Lower McGee Run Reservoir was constructed in 1888 at a cost of $9,138.80. The capacity of the two McGee Run Reservoirs is 4,500,000 gallons. Water was turned into taps on March 31, 1888. There were 24 taps made and applications for an additional 31. On the Lower McGee Run Reservoir was completed and water was fed into the system. Also, during this period 21 fire hydrants and 20 stop valves were installed. Contracts for construction of the water dams, transmission mains and distribution system were awarded September 14, 1887.Ĭonstruction started on Octoand continued until Decemwhen cold weather set in. The Derry Water Company obtained its charter on May 4, 1887. The Hillside rights were later sold to Blairsville Borough to enhance their water supply for $10,000.00. McGee Run, Millwood Run and Hillside Run. They obtained the water rights to three streams within the Derry Area. These men saw a vision of a future Derry. The original Board of Directors and shareholders of the Derry Water Company. A Brief History of the Derry Water Companyĭerry Water Company Incorporated May 12, 1887.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |